Steel Module
|
Planning
- Reduces time and costs associated with performing material take-offs and translating construction documents into action
- Increases productivity through the generation and sequencing of optimal weekly work plans at a crew level
- Improves communication and coordination with fabricators on priorities and onsite delivery
- Streamlines the planning and management of systems turnover and testing
|
|
|
Status Tracking
- Improves decision making through an ability to visually monitor construction status against the project schedule
- Enables greater control over the scheduling and monitoring of design and procurement activities to meet the needs of construction and operations sequencing
|
|
|
Reporting
- Enables the project team to rapidly produce detailed and accurate estimates of labor and cost as detailed design data becomes available
- A flexible reporting system can display information about critical project data. For example:
- Bill-of-Materials
- Work Steps for Construction
- Shortage Lists
- Progress and Status Information
- Hanglists
|
 |
Organization
- Re-organizes the engineering CAD model based on user specified attributes. For example:
- Area
- Material or Spec
- Weight
- Elevation
- Substantially improves the ability to make the transition from construction by areas to systems for testing and turnover
|
| |
4D Playback
- Links project schedule to model components
- Supports steel workflow through design, fabrication, delivery and construction.
- Simulates various schedule scenarios enabling users to create the most efficient and effective schedules
|
| Return to top |
Misc. information specific to Steel
- Supports seamless data translation from steel design packages.
- Supports steel workflow through design, fabrication, delivery and construction.
- Simplifies task level planning and improves communication through intuitive interface and visualization for hang lists (work sequences of individual steel pieces).
|